HQ LEGNAGO - PRODUCTION SITE

Legnago (VR) - Italy

Production Site: 22000sqm Legnago

In the new Riello site in Legnago (Italy) the Center of Excellence for Product Development and Burner Production covers an area of about 22,000 sq.m. out of a total 60,000 sq.m.. It was designed paying particular attention to the quality of the working environment within the factory so as to create an excellent union between the conditions of people working there and the high quality resulting from their activity.
The 12 assembly lines for residential burners are characterized by the highest flexibility in production, responding in the shortest time to the various requests for different models: 100% of oil burners are subject to a firing test distinguishing the Riello residential product. Then there are 3 assembly lines for commercial burners up to 2 MW and industrial islands for burners between 2 and 32 MW all equipped with 100% simulated testing.
Highly qualified personnel work on both the assembly lines and the areas dedicated to industrial burners, assuring the highest quality standards which are becoming always more frequent as the design follows the continual improvement of the product and the market.
The structure’s leading edge is the area for the production of oil pumps which, starting from the fully automated working of the cast iron bodies, ends in a semi-automated assembly line which assures flexibility, high quality thanks to the 100% final testing as well as high productivity.
A tight control over the supply process strengthened by automated testing during the various stages of working and assembly together with a computerized flexible shipping department all help to open and close the production cycle of a burner and its spare parts.






VOLPAGO - PRODUCTION SITE

Volpago (TV) - Italy

Production Site: 17000sqm Volpago

The site in Volpago has produced boilers for over 25 years. The know-how already established process was relaunched with an ambitious project that involves:
  • Range Boiler 7200 / 2 Plus 200-1000 (also available in Ready version)
  • 7200 Range Boiler Plus 200-1000
  • Natural Circulation Boiler Range 150-300

The two Italian sites have a total of 578 full-time employees.



SHANGAI - PRODUCTION SITE

Shanghai - China

Production Site: 14880sqm Shangai

The new Riello Heating Equipment (Shanghai) Co. Ltd. in Jinshan has been inaugurated on 10th November 2009.
This new Riello site covers an area of 15,000 sq.m out of a total 22,000 sq.m. employing a total of 109 local staff.
The site has a threefold significance:
  • Production of burners for the local market and production of strategic components;
  • Training the sales network inside an important training center capable of testing burners for applications up to 6 t/h.
  • Qualitative and logistics hub responsible for verifying all the purchases of Riello in China.
An important establishment to supports Riello’s activities on the local market.






TORUN - PRODUCTION SITE

Torun - Poland

Production Site: 16000sqm Legnago

Riello started its business in Toruń in 2001.
The plant manufactures wall hung boilers and water heaters for the European market, as well as floor-standing boilers for the European, North American, and Canadian markets.
Currently, five productions are operational at RUG RIELLO Urzadzenia Grzewcze S.A. The site employs 407 full-time staff.
In addition, RUG carries out commercial and training activities, training over 1,000 people each year through a comprehensive training system, a professional laboratory, and expert staff.



Mississauga - Canada

Assembly and Test Site: 5000sqm Missisagua

The North American Riello site is in Mississauga, Toronto, Canada, and was built in 1980.
It is dedicated to applications engineering, assembly, testing, and warehousing, with operational facilities in both Toronto (Canada) and Boston (Massachusetts).
Thanks to a comprehensive distribution, sales, and product support network from coast to coast, Riello demonstrates a steadfast commitment to customer satisfaction across North America.
The Mississauga site employs 64 local staff.